Planning for units
A contractor will normally want a site visit, a plan of work and information about the site before quoting. Operations may need to pause or move away from the work area.
Duty to manage
Owners and managers of non-domestic buildings have a duty to manage asbestos in them. Roof removal can be part of a plan, but a survey is a good starting point.
Dealing with tenants and neighbours
If a building is let, tell your tenant before work starts. Contractors can advise on notices and access.
Who does the work, and what the law expects
Lymefield Asbestos Removal is an introduction service. We pass your details to an independent contractor, who provides the written quote, carries out the work and holds the insurance and any competence they need. Removing asbestos cement sheets is work with real exposure risk, so it should be done by trained people with dust controls, and the waste should be wrapped, labelled and taken by a registered carrier.
What to send us
- Two or three clear photos of the roof and the building
- Roughly how big it is, in sheets or metres
- The age of the building if you know it
- Whether it leaks or is cracked
- Whether you want a new roof, and any deadline
Prices on this site are guides only. Only the contractor's written quote counts.
How it works.
- 1
Send photos and details
Tell us where the roof is, roughly how big it is and what it covers. A few clear photos from the ground are enough to start.
- 2
A local contractor replies
An independent contractor in your area looks at your details and confirms in writing what they would do and what they need to check.
- 3
Check and confirm
The contractor confirms the material, the access and the waste route, and sets a date that suits you.
- 4
Roof comes off, new roof goes on
The old sheets are taken down and wrapped, the structure is checked, and a new roof is fitted if you want one. You receive the waste paperwork.
What affects the price.
- Roof area and height
- Plant and access equipment
- Occupation and operating hours
- Replacement roof specification
- Waste volume and transport
Good to know.
Can the unit keep operating?
Sometimes, with work areas separated. Often not under the roof being worked on.
Do I need a survey first?
For non-domestic buildings, a survey is usually the starting point. The contractor can advise.
How long does a unit roof take?
It depends on size and weather. A written programme should come with the quote.
Do you do the roofing yourselves?
No. We are an introduction service. We pass your details and photos to an independent local contractor, who provides the written quote and carries out the work.
What should I send?
Two or three clear photos of the roof and the building, roughly how big it is, whether it leaks, and a postcode. A phone photo is fine.
Should I test it first?
Not always. Many contractors treat a cement sheet roof of that age as asbestos. A laboratory test gives certainty and a record, and the contractor can advise.
Where we cover.
Newcastle-under-Lyme, Stoke-on-Trent and the towns and villages around them.
Tell us about the roof.
A local contractor reviews your details and photos, then replies with a written quote for removing the old roof and, if you want it, fitting a new one. Free to ask, no obligation.